No fee unless we recover compensation for your family Text size 833-4-ASBESTOS (833-427-2378) Free Case Review

Search

2 results for “Ford Motor Company”

  1. Company document · Union Carbide documents · July 9, 1971 · page 5

    R. W. Schwartz Memo Forwarding Minutes of the GE/Hooker/Union Carbide Safety Meeting on Asbestos Handling (1971)

    In the document: …The possibility of such a system for asbestos should be investigated. The wood flour system is impeded by moisture. Ford Motor Co. has experimented with a closed bulk system with asbestos mined by JohnsManville. G.E…

  2. Company document · Union Carbide documents · August 1980

    Ruth Clise to R. F. Painter: Industrial Hygiene Monitoring Reports for Asbestos During Insulation Stripping in Bldg. 777 (1980)

    …E. Templeton, Bldg. 777 elevator shaft area, 8/25/80, bagging insulation (UCC 016638) Monitoring report (W-1078) for D. C. Shamblin, same location, 8/25/80, stripping insulation (UCC 016638A) Monitoring report (W-1078) for…