6 results for “Union Carbide Corporation”
-
Company document · Union Carbide documents · February 12, 1970
Asbestos Flowsheets Nos. 1-4: Ore Supply, Refining and Filtration, Final Product Handling, and RG-244 Circuit (1970)
Four hand-drawn process flowsheets for the asbestos operation, dated 2-12-70 and signed with the initials "ROM". They trace ore from the pit through mining, the mill stockpile, screening, jigs, cyclones and magnetic separators, then refining and…
-
Company document · Union Carbide documents · February 12, 1970
Asbestos Flowsheets No. 2, 3 and 4: Refining, Filtration, Final Product Handling and the RG-244 Circuit (1970)
Three hand-drawn process flowsheets for an asbestos mill, each dated 2-12-70 and initialed "Rom". They show refining and filtration (Flowsheet No. 2), final product handling (No. 3) and the RG-244 circuit (No. 4), with the equipment and department…
-
Company document · Union Carbide documents · August 10, 1972
Calidria Asbestos Mill Flowsheets, with Handwritten Annotations on Refining, Filtration and Drying Capacity (1972)
Six pages of hand-drawn process flowsheets for the asbestos mill: ore supply and rock fiber circuit, refining and filtration, final product handling, and the RG-244 circuit. The flowsheets are marked 'ROM 2-12-70, Revised 8/10/72'. Pages 1 and 2 are…
-
Company document · Union Carbide documents · November 2, 1983
Handwritten Note on OSHA's Emergency Temporary Standard News Release and the UCC Response, Headed "Air Sampling" (1983)
A one-page handwritten note headed "Air Sampling" and addressed to a list of initials. The writer says an attached OSHA news release should not affect the operation "here" and that the Asbestos Information Association/North America had sued over…
-
Company document · Union Carbide documents · 1970 · page 1
Asbestos Flowsheets Nos. 1-4: Calidria Mill Process Diagrams from Ore Supply through Final Product Handling and RG-244 Circuit (1970)
In the document: …A‘ee DUIS 7} Sate cay «9 z i seeorak> .4 ~ aQ39-} ee Rie ue (eo \ LNNODIY wasveg 2] — Ma07 5 Zt Sel oR ~ ad Union Carbide trial exhibit UC-8: Asbestos Flowsheets Nos…
-
Company document · Union Carbide documents · December 2, 1983 · page 1
Roger to JLM, Rom, RJK/BEU, RLG and PRW on a Proposed New Tailing Disposal Area, with Attached Regulation IV Excerpt and Sketch (1983)
In the document: …2.10.5.3. for inactive waste disposal sites for asbesto s tailings, OG RWAEINAWA Aw mademntancwwe Banned a..na 8... Union Carbide trial exhibit UC-416: Roger to JLM, Rom, RJK/BEU, RLG and PRW…